Monday 23 October 2017

WEEK 5 (28.8.2017 -- 1.9.2017)

For this week, we had done continuity test for our DC vibration motor and also the switch. The reason we done this test is to check if there is current flows through our components. The power supply is from the power bank.



THE CONTINUITY TEST FOR DC VIBRATE MOTOR



THE CONTINUITY TEST FOR THE SWITCH

No comments:

Post a Comment

WEEK 15 (13.11.2017 – 17.11.2017)

For this week, we had done our project and just need a little touch up before the exhibition which is on 15 th November 2017. Besides, we ...